Adam
Active Member
So right now i am swamped at work and at home i think at home i have 5 projects all need finishing and only two have the product lol. So i am running power out to my unattached garage with door opener i have all that so i will get that finished this weekend and i already dug the trench this week ahhhhhhh
Second is a paved walkway from the back door of the house to the garage and driveway. Ordering all supplies tomorrow and will be here ready for me to get to it.
Finish family room which i need to find a match for the laminate flooring i used so i am at a hault right now. 4 feet short lol. then ceiling tile and trim and thats done.
So now the rc projects. Finish tuning the Raptor and no its still not running perfect. Almost but not yet. Finish the arf plane which is on the work bench. Finish building the balsa kit in spare time.
Wheh thats it
Or wait Oh yeah im changing the oil in both vehicles this weekend.
anybody want my life lol Trucking takes all your time
Second is a paved walkway from the back door of the house to the garage and driveway. Ordering all supplies tomorrow and will be here ready for me to get to it.
Finish family room which i need to find a match for the laminate flooring i used so i am at a hault right now. 4 feet short lol. then ceiling tile and trim and thats done.
So now the rc projects. Finish tuning the Raptor and no its still not running perfect. Almost but not yet. Finish the arf plane which is on the work bench. Finish building the balsa kit in spare time.
Wheh thats it
Or wait Oh yeah im changing the oil in both vehicles this weekend.
anybody want my life lol Trucking takes all your time