I have been flying my T-rex 600 for three years now and didn't realise that I had to get all the mixing and feathering arms at 90% as well as the swash at 50% stick until I watched Tonys great video on the complete head setup. I built it from the kit and just set the links to the size on the instructions and I just learned to fly it like as it was. I had just mastered loops with it so I can't wait till the weather over here gets better so that I can go out and try it again.
Just a couple of questions if I may? I have increased my cyclic pitch now to AIL 6.7 & ELE 6.8 by adjusting the swash AFR. Now I have AIL -60 ELE +60 & PIT +45 should I also increase the PIT to 60? And When setting up the blade pitch using a flybar locking tool should I also make sure that the tail boom is level?
-John
Just a couple of questions if I may? I have increased my cyclic pitch now to AIL 6.7 & ELE 6.8 by adjusting the swash AFR. Now I have AIL -60 ELE +60 & PIT +45 should I also increase the PIT to 60? And When setting up the blade pitch using a flybar locking tool should I also make sure that the tail boom is level?
-John