murankar
Staff member
I started looking at the PDF instructions on the build. It looks like it is going to be a longer build that I thought it would be. I am trying to figure out how I am going to run the setup process. I noticed that in the setup section of the build they want cyclic pitch to be +-7 degrees. This is a flybar setup, so should I be concerned about this? If I should try and set this how would I go about doing this? The PDF said to use the endpoints to adjust accordingly. The last issue I may have is running the cables after installing the electronics along with RX placement. I am concidering on using my 6 channel RX since it binds with my TX. Will see how this goes.
The Build instructions, which I have read many times already is setup logical order. I may deviate a little bit depending on how it builds.
Yesterday I ordered the last bit of odds and ends for the build i.e. Gyro mounting tape, velcro, a towel to build on and pitch setup tools for this bird. The Pitch gauge set has two one for the blades and both are used for the flybar paddles and the last piece is a flybar lock.
The Build instructions, which I have read many times already is setup logical order. I may deviate a little bit depending on how it builds.
Yesterday I ordered the last bit of odds and ends for the build i.e. Gyro mounting tape, velcro, a towel to build on and pitch setup tools for this bird. The Pitch gauge set has two one for the blades and both are used for the flybar paddles and the last piece is a flybar lock.