Ok I am still making decisions on how to run my bec. I know that having a separate connector is ideal for safety but I have a safety kill switch in route for the esc. When the key is in no motor, key is out you have motor.
So with that said I made an attempt to solder the ec3 onto the esc with the bec attached. That did not fair so well since the esc wire is just about the same size as the bullet well. So my next option is to cut back some insulation on the esc and attach it a bit lower than the ec3.
To help support the joint after shrink tube I was thinking about doing a small zip tie and secure the wired pair together.
As for the build order i think I will do the entire build first place the electrics then worry about the details of soldering and cable running.
As for the batteries being shifted to the inside well that is working and not at the same time. My gensace have a snug fit in the frame which makes it difficult to strap in, actually impossible. So I have to rely on friction and Velcro on the tray and battery. I do however like the battery tray the way it is.
I think I might be able to get both the rx and gyro on the tail case. Not sure yet if that will be the final place though. I will need to have the case open in the event of damage to the boom. At the very least the rx can sit in the back of the heli on the lower frame.
Need to return to my work at work This is just some of my thoughts right now.